CALIFORNIA
CRANE SCHOOL
888-967-7277
SIGN UP
Empty
CRANE TRAINING WHO WE ARE RESOURCES
mobile crane operator

Take a
Free Practice Test

Fill out our short 10 question quiz to discover how you would place on your crane operator certification written exams. Don’t be discouraged if the scores weren’t as you expected. California Crane School has prepared thousands of candidates on their crane operator certification journey with some of the highest pass rates.

After attending our course, come back to see how your results have improved!

From Application to Certification,
we’re with you every step of the way.

Complete the free quiz below to the best of your knowledge. If you don’t know an answer, leave it blank. Upon completion you will receive your scores.

line big

13. Upon the employer's request, the owner/operator of a power line must provide voltage information within how many working days of the request?

  • A.10

  • B.5

  • C.3

  • D.2

14. When working near energized powerlines and the use of a tagline is necessary which type of taglines must be used?

  • A.non-conductive

  • B.conductive

  • C.fiber-based

  • D.incandescent

15. According to OSHA what is the minimum distance required when operating a crane near 35kv power lines?

  • A.6 feet

  • B.10 feet

  • C.12 feet

  • D.15 feet

16. Who is required to complete the shift inspection before or during each shift in which the crane or crane-related equipment will be used?

  • A.a competent person

  • B.a desinated person

  • C.the employer

  • D.a crane operator

17. Documentation of annual/comprehensive inspection must be maintained for a minimum of:

  • A.1 year

  • B.2 years

  • C.3 years

  • D.5 years

18. During a shift inspection, rotation resistant wire rope must be inspected for apparent deficiencies. Which of the following conditions would NOT require removal from service?

  • A.3 broken wires in 30 rope diameters

  • B.kinking or crushing or unstranding

  • C.reduction in rope diameter

  • D.electrical arc damage

19. The crane must have a level indicator that is either built into the equipment or available where?

  • A.in the vicinity of hoisting operations

  • B.on the jobsite

  • C.on the equipment

  • D.from another crane

20. If a category II operational aid such as an anti boom angle indicator is not working properly a temporary alternative measure must be taken to continue working, and the repair must be completed no later than how many calendar days after the deficiency occurs?

  • A.5

  • B.7

  • C.10

  • D.30

21. According to OSHA Telescopic boom cranes manufactured after February 28, 1992 must be equipped with which of the following?

  • A.load block

  • B.positive swing lock

  • C.load elevation maintnance device

  • D.anti two-blocking device

22. The category 1 operators aid that automatically prevents damage from contact between the load block, overhaul ball, or similar component and the boom tip is refered to by OSHA as?

  • A.boom hoist limiting device

  • B.anti two-blocking device

  • C.boom tip contact indicator

  • D.sheave damage deceleration device

line big

Please, provide your email to receive the test results.

Check your email for test results.

Your test is empty.